For Con Edison and Waterworks Joint Venture, MFM is installing 5,245 LF of 12″ and 20″ steel gas main, 200 LF of high pressure gas main and 800 LF of gas services. MFM’s scope of work includes cathodic protection installation, construction of tie-in pits, rock excavation, restoration and support of Con Edison for live tie-ins.

This work is being performed in connection with the NYCDDC MED609 trunk  main project.